COVID - 19 Notice | Contractors Team is business as usualDiscover More

125 Finchley Road

Project Location
SWISS COTTAGE, NW3 6HY
Project Type
Cat A Fit-Out

Embarking on a transformative journey, we proudly present our initial foray into the commercial sector, specifically within the Cat A Fit-Out. This groundbreaking project, situated directly above Swiss Cottage Tube station, signifies the dawn of a new chapter for our team as we rejuvenate a 1477 sq. meter red brick building.

Project Overview:

 

The meticulously refurbished building now stands as a symbol of modern office space, spanning three floors and featuring 176 workstations, 5 meeting rooms, 7 offices, and various amenities aimed at enhancing productivity and well-being. From vibrant breakout areas to a serene private terrace covering over 120 sq. meters, every aspect is meticulously designed to redefine the contemporary workspace.

 

Project Highlights:

 

  • Complete strip-out and redesign for our new Cat A installation.
  • Implementation of advanced VRF air conditioning system.
  • Comprehensive M&E design and installation.
  • Integration of cutting-edge acoustic rooms for virtual meetings.
  • Installation of fully accessible raised floor systems.
  • Construction of modern kitchen facilities on multiple floors.
  • Luxurious shower room and changing facilities with bespoke amenities.
  • Stylish W.C. facilities with custom stainless-steel fittings.

 

  • Timber composite decking with sliding doors and an inviting pergola.
  • Design and installation of a vibrant planting scheme featuring over 51 powder-coated metal planters.
  • Landscaping enhancements including fencing and waterproof decking.
  • Modernized front façade with sleek aluminium cladding.
  • Installation of energy-efficient triple-glazed aluminium windows.
  • Selection and installation of fire-rated door sets.
  • Comprehensive decorative package showcasing oak panelling and polished concrete flooring.

 

Conclusion:

 

With meticulous attention to detail and an innovative approach, our team has established a new standard of excellence in the Cat A fit-out within the commercial sector with our inaugural project above Swiss Cottage Tube station. This endeavour not only demonstrates our expertise in revitalizing traditional spaces but also underscores our commitment to shaping the future of modern office environments.

Stay in the know

newsletter subcription